Psalm 72

Psalm 72 Psalm 72 is a 501(c)(3) nonprofit equipping believers and strengthening the Body of Christ. We’re not a church.

We build up the Church through evangelism, discipleship, and a future ministry school centered on the gospel and power of the Holy Spirit! 🔥

06/17/2026

It has been 1 year, to the date, of the first hammer swing that started the renovation process at the ministry building! Praise God for all He has provided and directed us towards. Let’s continue to labor, in Christ, for our breakthroughs! 💪🏻

I told the walls they were looking good. They said, “Thanks, we’ve been through a lot.” 😄A major milestone has been reac...
06/11/2026

I told the walls they were looking good. They said, “Thanks, we’ve been through a lot.” 😄

A major milestone has been reached at Psalm 72: the drywall is officially primed!

After demolition, framing, electrical work, insulation, drywall, mudding, and sanding, the walls are finally sealed and ready for paint. It may seem like a small step, but this is a huge moment for those who have been following the project from the beginning.

Even more exciting, flooring installation has officially begun. Arlan from Fisher Brothers Builders is helping us over the next couple of days, and we’re incredibly grateful for his generosity and service.

There will also be opportunities next week for volunteers to help with flooring, so if you’ve been looking for a way to get involved, now is a great time.

The project is still tracking close to the $20,000 mark, and every dollar invested is helping create a space for discipleship, evangelism, ministry training, and equipping believers for years to come.

Would you consider being part of the story?

You can pray. You can volunteer. You can give.

To partner financially:
Psalm72.org/give

If you’ve been following the renovation, what’s been your favorite transformation to watch so far?

Psalm 72 is working hard to bring this renovation project to a close by the end of August, and we would love for volunte...
06/03/2026

Psalm 72 is working hard to bring this renovation project to a close by the end of August, and we would love for volunteers to look over the schedule below and see where they can best plug in.

Whether you are skilled in construction, painting, flooring, trim work, plumbing, cabinets, cleanup, or simply willing to lend a hand, there is a place for you.

Here is the current construction schedule:

June 1–5
Sanding and finishing any construction before flooring

June 8–10
Primer on walls, ceiling paint, and one top coat on walls

June 11–12 and June 15–17
Laying flooring

Weeks of June 22, June 29, and July 6
Installing trim

July 13–17
Painting everything

July 20–24
Staining stairs and installing risers

July 27–31
Installing cabinets, tile wall, finishing plumbing, and shelves

August
Finishing anything and everything that still needs to be completed

This is a huge step for Psalm 72, and we are so grateful for every person who has prayed, given, encouraged, and served along the way. Now we are asking for help to finish strong.

Please comment below or message us if you are available to help during any of these dates, and let us know what type of work you would be most comfortable doing.

Thank you for helping us prepare this space for ministry, discipleship, outreach, and the work God is building in Lewistown.

If drywall dust was a spiritual gift, we’d all be operating in it by now. 😅The momentum is REAL.This week we officially ...
05/30/2026

If drywall dust was a spiritual gift, we’d all be operating in it by now. 😅

The momentum is REAL.

This week we officially finished mudding all of the walls, going through 12 buckets of drywall mud in the process. For the first time, these office spaces are starting to feel like actual finished rooms instead of a construction zone.

Next week, Trapper Ehrnzeller will be sanding. The following week, we’ll be priming, painting ceilings, and getting the first coat on the walls. After that, Fisher Brothers Builders will be helping us begin the flooring installation, and we’re believing for a few more people to jump in and help finish the floors.

Once flooring is complete, we’ll move into trim work, followed by caulking, filling nail holes, and final paint. After that, we’ll still have stairs, cabinets, bookshelves, the kitchenette, and hundreds of finishing details to complete.

The exciting part? The finish line is finally starting to come into view.

We’ve also had 2 of the 5 air conditioning units donated already! We’re still believing for the remaining units and are incredibly grateful for everyone who has partnered with this project.

Psalm 72 isn’t just building office space—we’re building infrastructure for discipleship, evangelism, ministry training, and Kingdom impact for years to come.

Thank you to everyone who has prayed, volunteered, donated, and believed with us. If you’d like to partner financially or get involved, visit:

psalm72.org/give 🔥

The change is coming!! Hallelujah 🙌🏻 What a momentous mile marker for us 🚀
05/22/2026

The change is coming!! Hallelujah 🙌🏻 What a momentous mile marker for us 🚀

Progress is happening! 🙌⚡All of the insulation is officially in, the 2,000 feet of wiring WORKS, and the lights are ON! ...
05/06/2026

Progress is happening! 🙌⚡

All of the insulation is officially in, the 2,000 feet of wiring WORKS, and the lights are ON! We’re pretty excited… you could say the atmosphere is electric. 😄

The vents have all been installed for the drainless AC units as well. Each unit costs around $500–$600, and we need 5 total to complete the project.

Custom ductwork for two of the offices are currently being built. The tongue-and-groove boards in my office ceiling have been polyurethane coated and installed. It’s looking incredible!

And now… drywall is going up! There is still a LOT of drywall work ahead, and we would truly appreciate volunteers willing to come help us keep moving forward.

Thank you to everyone praying, giving, supporting, and serving. Seeing this vision continue to come to life is amazing. One step at a time, God is building something special here. 🔥

Ministry Building Update  4/22/26 🛠️We have officially entered the “putting things back together” phase — and it’s incre...
04/22/2026

Ministry Building Update 4/22/26 🛠️

We have officially entered the “putting things back together” phase — and it’s incredibly rewarding to watch a vision that was given in the Spirit now being built in the natural.

Here’s where we’re at:

• ✅ All office ceilings are up (40 sheets of 10’ drywall!)
• 💡 LED lights are installed and ready — we’re just a couple switches away from having full lighting in the offices and hallways
• ⚡ We prioritized getting electricity hooked up first so we can work with proper lighting moving forward
• 🙌 Huge thank you to Ben Hurst for helping with the sub panel — removing old circuits and making room for 3 new circuits (including a dedicated one for a kitchenette microwave)
• 🧱 All insulation is in for the walls

What’s next:

• Drilling holes through the brick and creating ductwork for 6 drainless AC units
• Hanging drywall on the walls
• Then… finishing drywall

The progress has been amazing, and it’s only possible because of people who are praying, giving, and showing up to serve.

If you want to be part of what God is building here, comment “serve” and we’ll reach out.

Let’s keep going. 🔥

Address

134 Shaw Avenue
Lewistown, PA
17044

Telephone

+17173202041

Alerts

Be the first to know and let us send you an email when Psalm 72 posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Place Of Worship

Send a message to Psalm 72:

Share