On Monday, crews installed the first exterior stone at the Vancouver Washington Temple. Although the initial stonework is difficult to see from the street and largely hidden behind scaffolding, it is expected to become more visible as additional stone is installed over the coming weeks.
Inside the temple, crews were framing the openings for the future stained-glass windows in the baptistry. Sheetrock installation has begun in some first-floor rooms. On the second floor, self-leveling is nearing completion, and Dusty, the construction layout robot, has mapped approximately two-thirds of the floor in preparation for the next phase of framing.