CUC Geotechnics Sdn Bhd

CUC Geotechnics Sdn Bhd We Specialize in Micropiling & Foundation Work

The purpose of site investigation is to get clear information about the soil and hydrological conditions at the site.Sit...
22/01/2016

The purpose of site investigation is to get clear information about the soil and hydrological conditions at the site.

Site reconnaissance
It means the inspection of the site and study of topography to get a proper information about the soil and ground water condition.

Project : River of Life - 2015 & 2016Venue : Masjid Jamek, Dataran Merdeka, Kuala LumpurConstruction : Pedestrian Bridge...
22/01/2016

Project : River of Life - 2015 & 2016
Venue : Masjid Jamek, Dataran Merdeka, Kuala Lumpur
Construction : Pedestrian Bridge
MRCB-Ekovest S/B

Micropile - Odex 280Project : River of Life - 2014 & 2015Venue : Masjid Jamek & BSAS, Kuala LumpurConstruction : Walkway...
22/01/2016

Micropile - Odex 280
Project : River of Life - 2014 & 2015
Venue : Masjid Jamek & BSAS, Kuala Lumpur
Construction : Walkway and Pedestrian Bridge
MRCB-Ekovest S/B

Maintain Load Test, also known as Static Load Test is necessary to ensure the pile that was casted could take the design...
22/01/2016

Maintain Load Test, also known as Static Load Test is necessary to ensure the pile that was casted could take the design load of the structure. During this test, load would be applied on the selected pile and the pile settlement under the acting load would be recorded. As a common practice, pile would be loaded up to twice of the working load, which is regarded as the Test Load of the pile.

PDA hammer 14 tonWe Suit Your Need
22/01/2016

PDA hammer 14 ton
We Suit Your Need

22/01/2016

Work description : Soil Investigation
Project : THRIVEN - Lumi Tropicana
Duration : January & February 2016
Venue : Tropicana, Petaling Jaya

Thriven Global Berhad

08/12/2015

Pre-bored
Work description : Pre-bored using down-to-hole

Project : Swan Lodge - Tmn Duta
Duration : December 2015
Venue : Tmn Duta

For API pipe tensile test
04/11/2015

For API pipe tensile test

-Swan Lodge-Air flushed Odex system with 18m permanent casing
04/11/2015

-Swan Lodge-
Air flushed Odex system with 18m permanent casing

PDA - 1.5 ton hammer
04/11/2015

PDA - 1.5 ton hammer

02/11/2015

Work description : Micropile - drilling with permanent casing OD 273mm by Odex240

Project : Swan Lodge - Tmn Duta
Duration : October & November 2015
Venue : Tmn Duta

Address

Persiaran Tropicana
Pulau Pinang
47820

Telephone

04-3970818

Website

Alerts

Be the first to know and let us send you an email when CUC Geotechnics Sdn Bhd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Place Of Worship

Send a message to CUC Geotechnics Sdn Bhd:

Share